VEDI GROUP
Home · Grants & 6% VAT
Grants & 6% VAT

What you still get in 2026, and what is gone

Over-promised grants are the biggest source of disappointment in our trade. A contractor deducts a handsome amount from the quote, and eighteen months later it turns out never to be paid. So we simply list the conditions as they are — including the ones that do not work in our favour.

6% VATHome older than 10 yearsMaterials and installation by the same contractor
Grant thresholdRd 3.0 minimumCarried out by a contractor, not DIY
ObligationLabel D within 6 yearsWhen buying a property with EPC label E or F
Calculate your façade price
The most certain benefit

6% VAT — for most homes, but not automatically

The reduced VAT rate is the benefit most owners are entitled to, and at the same time the one most often lost by accident. On a €15,000 façade project, the difference between 6% and 21% is over €2,000.

The four conditions

  • Your home is more than ten years old
  • It is mainly in private residential use
  • Materials and installation are supplied by the same contractor
  • The invoice is addressed to the end user

Where it goes wrong

At the third condition. If you buy the insulation boards yourself — because you found a good price somewhere — and only have them installed, those materials fall outside the reduced rate and you pay 21% on them. The saving on the purchase is then usually smaller than the VAT difference.

VediWorks always supplies materials and installation together. Not as a sales model, but because it is the only way you keep the rate with certainty — and because we can only guarantee a system we supplied ourselves.

Mijn VerbouwPremie

The 2026 situation, without the sugar-coating

The grant for wall insulation changed fundamentally in 2026. For part of all owners it no longer exists. That is unwelcome news to deliver, but it beats hearing it after the work is done.

Income categoryGrant for wall insulationMaximum
The two highest categoriesCategory 1: above €55,020 (single) or €78,610 (household). Category 2: from €43,240 or €60,520. Since March 2026 no grant at all for wall insulation
Category 3€24,750 to €43,240 (single), €37,110 to €60,520 (household). Up to 35% of the invoice amount ± €3,500
Lowest categoryUp to €24,750 (single), up to €37,110 (household). Up to 50% of the invoice amount ± €5,000

The income thresholds above are indicative 2026 figures and rise per dependent person; your exact category is calculated in the simulator. A cap of 100 m² also applies to wall and roof insulation. The application runs through Mijn VerbouwLoket and can be submitted up to two years after the date of the final invoice. Always check the current conditions yourself on the Mijn VerbouwPremie website before signing anything — our page, too, can lag behind a rule change.

The technical conditions

External wall insulation requires the insulating material to reach an Rd value of at least 3.0 m²K/W, and the work must be carried out by a contractor — DIY does not qualify. Rd 3.0 is reached with graphite EPS from roughly 10 cm, and with white EPS only from roughly 11 cm.

We install 14 to 16 cm as standard, giving Rd 4.4 to 5.0. Not to clear the grant threshold, but because a façade you tackle once in thirty years deserves it. How that calculation works is set out on choosing your insulation.

Are you letting the property?

Since March 2026 private landlords fall into the highest income category and therefore no longer receive a grant for wall insulation, whatever their own income. If you let through a housing association, the opposite applies and you receive the highest grant amounts. That difference is large enough to check before you decide.

An apartment building or owners' association?

The façade is a common part, and for common parts the owners' association applies for a base grant itself, through the managing agent. Individual owners in the lower categories can submit their own application on top of that for their share. We produce the survey and the quotation at building level, so the managing agent has one file instead of twenty.

When the grant falls away

Mijn VerbouwLening — borrowing at almost no interest

The two highest income categories lost their wall insulation grant in March 2026. What category 2 did not lose is the option to finance the work at 1.5%. For the lowest category the loan is interest-free.

Income categoryInterest rateIndicative on €15,000 over 15 years
Highest category (1)Does not qualify
Category 21.5%± €93 per month
Category 30.5%± €87 per month
Lowest category0%± €83 per month

You borrow from €4,000 to €60,000, over a term of up to 25 years. The monthly amounts above are our own worked examples for illustration, not an offer: your file is assessed by the lender, who also provides the exact repayment schedule. Façade insulation qualifies; interior renovation no longer does since 2026.

Apply for the loan before the first invoice

This is the mistake that costs money. For Mijn VerbouwPremie you apply after the work, up to two years after the final invoice. For Mijn VerbouwLening it is precisely the other way around: at the time of application there may be no invoices yet. If you only decide to borrow after our final invoice, you are too late.

That is why we ask during the site visit: are you considering financing? If so, we schedule the work after your application rather than before it. Both applications run through Mijn VerbouwLoket, not through us — we supply the invoices and technical data sheets your file needs.

No longer available

What ended in 2026

Three support measures our clients still ask about no longer exist. Better that you read it here than budget for it.

Mijn EPC-labelpremie

The desk closed on 30 June 2026. New applications are no longer possible, not even for work you are carrying out now.

The Flemish demolition-and-rebuild grant

Scrapped on 1 January 2026. The federal 6% VAT rate for demolition and rebuilding does still exist, permanently, but that is a VAT arrangement with its own conditions — your sole own home, a maximum of 200 m² habitable floor area and a five-year occupancy obligation — and not a grant.

The solar panel grant

In Flanders there is no grant for solar panels any more; the last one expired at the end of 2024.

What does remain for everyone

The grant for heat pumps and heat pump boilers remains in place until the end of 2027 for all income categories, including those who lost their wall insulation grant. We do not install them.

The order is worth knowing all the same: insulate the envelope first, choose the heat pump afterwards. A well-insulated façade lowers the output you need, and therefore the price of the installation. Do it the other way around and you pay twice over — first for an oversized pump, then for heating a façade that holds nothing back.

And the benefit you are certainly entitled to is at the top of this page: the reduced 6% VAT rate.

The renovation obligation

Not a grant, but a deadline

Anyone who has acquired a residential home or apartment with EPC label E or F by notarial deed since 2023 must bring it up to at least label D within a set period. That is not an encouragement but an obligation, with a fine behind it.

📅

Six years since 2026

On 1 January 2026 the period was extended from five to six years after the notarial deed, and that extension also applies to obligations already running. So you have a little more breathing space than before — but the clock starts at the deed, not at the moment you think of it.

⚠️

If you do not make it

A fine of €500 to €5,000, plus a new period in which the obligation must still be met. The fine does not replace the renovation.

📊

Why wall insulation weighs so heavily

According to the Flemish government's Woningpas, insufficiently insulated external walls are the second largest cause of heat loss in a home, after the roof. In an EPC calculation a well-insulated façade therefore translates into one of the biggest jumps you can make with a single intervention.

🎯

And the bar is higher than the grant threshold

In its 2050 energy target the Flemish government assumes at least 14 cm of EPS or mineral wool for external walls. If you are insulating now, that is the level to aim for — not the 10 cm with which you just about qualify for a grant file.

"

We build the value of your façade on comfort, savings and 6% VAT. If a grant comes on top, that is a bonus.

— VediWorks
Our role

What we do for you, and what we do not

What we do

  • Go through your situation during the free site visit and say honestly whether a grant is realistic
  • Supply and invoice materials and installation together, so the 6% rate is preserved
  • Draw up invoices that support the grant file, listing the materials used and their technical values
  • Hand over the technical data sheet and the ATG reference of the system installed
  • Guide you through the application if you qualify

What we do not do

  • Deduct a grant amount from our quotation as though it were already in
  • Estimate your income category — you know it, we do not
  • Promise that the conditions will not change again, because they do
  • Propose a thinner board because it just clears the grant threshold

This page explains the regulations as we understand them; it is not tax or legal advice. What you ultimately receive is decided by the Flemish government, not by your contractor. Always check the conditions through the official channels.

Budget with the price without a grant first. Anything above that is a gain.

The façade price tool gives you an indicative range excluding VAT. During the site visit we go through together whether a grant is added in your situation.

Calculate your façade price
Price in 2 min
Paperwork in order
No empty promises
Frequently asked questions

About grants and VAT

When does the 6% VAT rate apply to façade insulation?
The reduced rate applies when your home is more than ten years old, it is mainly in private residential use, materials and installation are supplied by the same contractor, and the invoice is addressed to the end user. That third condition is the most important and the most underestimated: if you buy the insulation boards yourself and only have them installed, you pay 21% on those materials instead of 6%. VediWorks always supplies materials and installation together, so you do not lose the rate.
Do I still get a grant for wall insulation in 2026?
That depends on your income category. Since March 2026 the two highest income categories no longer receive Mijn VerbouwPremie for wall insulation. For income category 3 up to 35% of the invoice amount remains, with a maximum of around €3,500; for the lowest income category up to 50%, with a maximum of around €5,000. A cap of 100 m² applies to wall and roof insulation. Always check the current conditions on the Mijn VerbouwPremie website before you sign anything.
What technical conditions apply to the grant?
External wall insulation requires the insulating material to reach an Rd value of at least 3.0 m²K/W, and the work must be carried out by a contractor — DIY does not qualify. Rd 3.0 is reached with graphite EPS from roughly 10 cm and with white EPS only from roughly 11 cm. We install 14 to 16 cm as standard, well above the threshold; that is a deliberate choice and not a grant matter.
I am in the highest income category. Is there still a benefit for me?
Yes, but not in the form of a grant. The reduced 6% VAT rate applies regardless of your income and is worth more than €2,000 on a €15,000 façade project. If you are in category 2 you can also borrow at 1.5% through Mijn VerbouwLening; category 1 does not qualify for that loan. In addition, the grant for heat pumps does remain available to all income categories until the end of 2027.
We are an owners' association. Can the building get a grant for the façade?
The façade is a common part, and for common parts the owners' association applies for a base grant itself, through the managing agent. Individual owners in the lower income categories can submit their own application on top of that for their share. We produce the survey and the quotation at building level, so the managing agent has one file to put to the general meeting rather than twenty separate applications.
Which grants ended in 2026?
Mijn EPC-labelpremie closed its desk on 30 June 2026. The Flemish demolition-and-rebuild grant was scrapped on 1 January 2026 — the federal 6% VAT rate for demolition and rebuilding does still exist, permanently, but with its own conditions. For solar panels there has been no Flemish grant since the end of 2024. The grant for heat pumps and heat pump boilers does remain until the end of 2027, for all income categories.
How do I apply for the grant and until when?
The application runs through Mijn VerbouwLoket and can be submitted up to two years after the date of the final invoice. You need the invoices for this, stating the materials used and their technical values. We draw up our invoices so that they support the grant file and provide you with the technical data sheet of the system installed. Note: for Mijn VerbouwLening it is the other way around — at the time of application there may be no invoices yet.
Why does VediWorks not promise a grant amount up front?
Because we do not know your income category and the conditions have changed and may change again. Over-promised grants are the biggest source of disappointment in our trade: a contractor deducts a handsome amount from the quotation, and eighteen months later it turns out not to be paid. We build the value of your façade on the reduced VAT rate, on comfort, on the saving and on a façade that lasts thirty years. If a grant comes on top, that is a bonus.
Vedi Group

Same home, a different job?

VediWorks is one of Vedi Group's four companies. Interior painting, a post-construction clean or maintaining shared areas: one contact, the same crews, the same standard.

Calculate your facade price →